The Seelisberg Tunnel is located on the A2 between Büel and Seedorf. The maintenance of the turning plate in the Seelisberg Tunnel requires a full closure of the south tunnel. As a result of this closure, traffic will be diverted into the oncoming lane (north tunnel) during the construction work. The full closure of the Seelisberg Tunnel will take place from Wednesday (26.03.2025, 4:00 AM) to Saturday (29.03.2025, 4:00 AM).
Please note that traffic disruptions may occur, and the duration of the full closure may change due to weather conditions.