Blog Slovenia: A1 towards Koper near Postojna restricted for months (until mid-November 2026)

Slovenia: A1 towards Koper near Postojna restricted for months (until mid-November 2026)

Last updated: 01.09.2026 Reading time: 2 Minute(s)
from Michelle Albrecht
Slovenia
Slovenia: A1 towards Koper near Postojna restricted for months (until mid-November 2026) AI generated

On the Slovenian A1 motorway between Unec and Postojna, the most important link from Ljubljana to the Adriatic coast and onwards to Croatia, extensive renovation works have been underway since spring 2026. The on-ramp at the Postojna interchange towards Koper is expected to be completely closed until the second half of November 2026, and traffic in the construction area is additionally reduced to a single lane in each direction with significantly narrowed lanes.

The section between the Ravbarkomanda viaduct and the Razdrto junction is affected. Anyone travelling towards Koper, Portorož, or onwards to Croatia in autumn 2026 should expect noticeable delays on this stretch, especially on travel weekends.

Which section is affected?

The reason for the works is a comprehensive renewal of the route section, including the demolition and reconstruction of a bridge over the Pivka river. The lanes have been narrowed to 3.0 metres (right) and just 2.3 metres (left), which can be particularly tight for wider vehicles and motorhomes.

How long will the restrictions last?

Construction work has already been underway since the beginning of March 2026. While the direction towards Ljubljana was reopened as early as July 2026, the on-ramp towards Koper at the Postojna interchange currently remains closed until the second half of November 2026.

Toll in Slovenia

In Slovenia, cars, motorcycles, and motorhomes up to 3.5 t GVW are subject to the vignette requirement. For vehicles over 3.5 t GVW, the distance-based toll via the DarsGo system with an on-board unit applies instead. As a special toll, Slovenia also charges a fee for the Karawanken Tunnel at the border with Austria.

Anyone travelling through several countries on their trip often gets a better deal with the Europamaut flat rate: for 12.80 euros a month, vignettes for all supported countries are included, with no minimum term and cancellable at any time.

The Europamaut team wishes you a pleasant journey!

You can find further information on our overview page for the Slovenia vignette as well as on the page Toll in Slovenia. Anyone also travelling towards Zagreb will find details of the second current construction site in our article on the full closure on the Dolenjska motorway. If you have any questions, you can reach us at any time by email.

FAQ

Frequently asked questions about the A1 restriction near Postojna

The most important answers about the construction site towards Koper.

Until when is the on-ramp towards Koper at the Postojna junction closed?

According to the current status, presumably until the second half of November 2026.

Michelle Albrecht
Michelle Albrecht
Hello, I’m Michelle, a writer through and through. As a copywriter, I’ve had the privilege of turning my passion into a career. I also channel my creativity into my own books, where I can truly let my imagination roam free. Ever since spending six unforgettable months in Australia, my love for travel has grown even deeper, something I didn’t think was possible. That’s why I’m especially delighted to share inspiring tips and ideas with my readers for their own future adventures.