Austria: A8 Innkreis Autobahn to be closed for ten months starting September 2026

Last updated: 21.10.2026 Reading time: 3 Minutes

from Michelle Albrecht

Austria: A8 Innkreis Autobahn to be closed for ten months starting September 2026 AI generated

The Innkreis Autobahn A8 will be completely closed in the southbound direction between the Wels-West and Voralpenkreuz interchange from 15 September 2026. The reason is a comprehensive safety renovation of the Noitzmühle and Steinhaus tunnels, into which ASFINAG is investing around 110 million euros.

In addition to the southbound closure, only one lane instead of two will be available in the northbound direction between 15 September and 31 October 2026. For long-distance truck traffic, a driving ban will apply in the city area of Wels for the entire construction period, with the exception of local destination and origin traffic.

Two construction phases until 2028

ASFINAG is dividing the renovation into two consecutive construction phases: In Phase 1, from September 2026 to early July 2027, the southbound direction will be completely closed. After a closure-free summer break, Phase 2 follows from mid-September 2027 to the end of June 2028, during which the northbound direction will be worked on. According to ASFINAG project manager Manuel Prentner, lighting, ventilation, emergency call systems, video surveillance and escape routes in both tunnels will be completely renewed.

Diversion and alternative routes

The signposted diversion leads via the Welser Autobahn (A25) towards Linz/Vienna to the Haid interchange and from there via the A1 towards Voralpenkreuz and Salzburg. For cars, the Welser Osttangente can serve as a shorter alternative. Travellers from Germany heading via Suben or Schärding towards Salzburg, Carinthia or further on to Italy and Croatia should factor the additional travel time via the diversion firmly into their journey planning.

Anyone continuing on via the A12 Inntal Autobahn towards Tyrol in autumn 2026 should also keep the eight-week full closure of the Landeck Tunnel from October 2026 in mind, as both construction sites coincide in time.

Toll in Austria

In Austria, the vignette requirement applies to cars, motorcycles and motorhomes up to 3.5 t gross vehicle weight. For vehicles over 3.5 t gross vehicle weight, the distance-based toll applies instead, which is collected via the so-called GO-Box. In addition, there is a separate route toll on individual tunnels and mountain pass roads in Austria, which must be paid there independently of the vignette or GO-Box.

Anyone who regularly travels through several countries often benefits from the Vignette Flat Rate: for 12.80 euros* per month, vignettes for all eight supported countries are covered, with no commitment and the option to cancel at any time.

The Europamaut team wishes you a pleasant trip!

You can find more information on our overview page about the Austria vignette as well as on the page Toll in Austria. If you have any questions, you can reach us at any time by email.

Frequently asked questions about the A8 closure near Wels

The most important answers about the ten-month complete closure of the Innkreis motorway.

How long is the A8 Innkreis Autobahn closed in total?

Which section of the A8 is affected?

Which route are travelers being diverted along?

* ASFINAG toll fee (10-day vignette): 12.80 €flat price (per monthly billing period): 12.80 €

Michelle Albrecht

Article by

Michelle Albrecht
Hello, I’m Michelle, a writer through and through. As a copywriter, I’ve had the privilege of turning my passion into a career. I also channel my creativity into my own books, where I can truly let my imagination roam free. Ever since spending six unforgettable months in Australia, my love for travel has grown even deeper, something I didn’t think was possible. That’s why I’m especially delighted to share inspiring tips and ideas with my readers for their own future adventures.

More articles

Austria: A2 Pack, Herzogberg Tunnel in two-way traffic until end of March 2027 AI generated

2026/11/17

A2 Pack, Herzogberg Tunnel in two-way traffic until end of March 2027

On the A2 Süd motorway in the Pack section, traffic has been running in a shortened...

Austria: 2027 vignette to get two percent more expensive and become digital-only AI generated

2026/10/24

2027 vignette to get two percent more expensive and become digital-only

The annual vignette for cars in Austria will become two percent more expensive in 20...

Austria: Truck dispatch control (Blockabfertigung) on the A12 near Kufstein – the remaining metering days for 2026 AI generated

2026/09/23

Truck dispatch control (Blockabfertigung) on the A12 near Kufstein – the remaining metering days for 2026

On the A12 Inntal Autobahn near Kufstein-Nord , Tyrol is continuing the controversi...