Renovation of the Pfänder Tunnel

Last updated: 14.09.2026 Reading time: 2 Minutes

from Michelle Albrecht

Renovation of the Pfänder Tunnel AI generated

According to ASFINAG, the renovation of the Pfänder Tunnel is planned from 10.03.2025 to 24.10.2025. The focus will be on the lighting system, traffic management, video surveillance, emergency call equipment, doors and gates, fire alarm system, control system, as well as the installation of acoustic tunnel monitoring. Please note that no construction work will take place on weekends or during the summer holidays (12.07.2025 - 09.2025), but use of the route will be restricted during the following periods:

Closures of the Pfänder Tunnel with partial restrictions

  • Closure of the normal lane from 10.03.2025 - 28.03.2025

  • Closure of the overtaking lane from 31.03.2025 - 11.04.2025

  • Closure of the Pfänder Tunnel from 14.04.2025 - 30.04.2025 (between 8 pm and 5 am)

  • Closure of the Pfänder Tunnel from 05.05.2025 - 11.07.2025 (between 8 pm and 5 am)

  • Closure of the Pfänder Tunnel from 08.09.2025 - 06.10.2025 (between 8 pm and 5 am)

  • Closure of the Pfänder Tunnel from 14.10.2025 - 24.10.2025 (between 8 pm and 5 am)

Total closure of the Pfänder Tunnel

A total closure of the Pfänder Tunnel will take place from 07.10.2025 to 13.01.2025.

Therefore, please take note of the total closure as well as the restricted use of the Pfänder Tunnel during other periods, in order to plan for possible delays and, if necessary, to take alternative routes.

Michelle Albrecht

Article by

Michelle Albrecht
Hello, I’m Michelle, a writer through and through. As a copywriter, I’ve had the privilege of turning my passion into a career. I also channel my creativity into my own books, where I can truly let my imagination roam free. Ever since spending six unforgettable months in Australia, my love for travel has grown even deeper, something I didn’t think was possible. That’s why I’m especially delighted to share inspiring tips and ideas with my readers for their own future adventures.

More articles

Austria: A2 Pack, Herzogberg Tunnel in two-way traffic until end of March 2027 AI generated

2026/11/17

A2 Pack, Herzogberg Tunnel in two-way traffic until end of March 2027

On the A2 Süd motorway in the Pack section, traffic has been running in a shortened...

Austria: 2027 vignette to get two percent more expensive and become digital-only AI generated

2026/10/24

2027 vignette to get two percent more expensive and become digital-only

The annual vignette for cars in Austria will become two percent more expensive in 20...

Austria: Truck dispatch control (Blockabfertigung) on the A12 near Kufstein – the remaining metering days for 2026 AI generated

2026/09/23

Truck dispatch control (Blockabfertigung) on the A12 near Kufstein – the remaining metering days for 2026

On the A12 Inntal Autobahn near Kufstein-Nord , Tyrol is continuing the controversi...